
General Contracting
Builing Surveys:
- 3D laserscanner survey to assess and analyse the realistic conditions of the building
- Expert testing of structures completed on site
Plan coordination:
- Preparation/preparation of detailed drawings from the client’s concept plans in close collaboration with the design team
- Design coordination with constant attention to the requirements of the authorities, manufacturers and customers
- Preparation and checking of production drawings, in close cooperation with designers and incorporation into the design
- Preparation of implementation plans
Execution:
- Timely provision of site information to client and designer in accordance with the project schedule
- Preliminary engineering drawings and detailed “how to do” for special structures with a problem-preventive approach, followed by quality control during installation
- Quality and time control of completed structures
Project closure:
- Completion of the completed structures
- Preparation of implementation documentation
